Project Year: 2012Client: TUPRAS (Turkish Petroleum Refineries Co. Inc.) - Project Investments Directorate
On 55 Concrete Foundations Along The Coastline;
450 Tons Steel Pipe Bridge Fabrication, Erection, Project Design and Construction Works
68.000 WDI (Dia-inches) Steel Piping Fabrication and Erection
95.000 WDI (Dia-inches) HDPE Piping Material Supply, Fabrication and Erection
112.000 m3 112.000 m3 Excavation, BackFilling and Concrete Works
125 Staff / Month
Total: 1.094.000 Man-Hour Working (48 Months)