All Base Concrete Works of the Facility
38 Tons Equipment Installation (2 Columns and 4 Heat Exchangers)
22.000 WDI (Dia-inches) Piping Fabrication and Erection
65 Staff / Month
Total: 124.000 Man-Hour Working (12 Months)